Cost-of-Service and Rate Analysis

Georgetown Divide Public Utility District (GDPUD) is a self-funding, community-owned water utility, created to provide safe, reliable drinking water to the communities of the Divide. The water services are funded by customer rate revenue to pay for operating and maintaining the system (labor, supplies, and electricity costs), as well as projects to rehabilitate all of the infrastructure, and other investments. In addition, for a financially resilient system, rates also go toward debt service to pay back loans and help with reserves to make sure GDPUD can respond and fund unforeseen circumstances.

Development of the Cost of Service Analysis utilized inputs, provided at the bottom of this page, to establish the cost of water service. The process included open meetings with the public and the Board of Directors which are archived herein for reference.

The Request for Proposals (RFP) was issued on February 1st, 2024. The District received two bids in response to the RFP.

GDPUD_RFP Water_Wastewater Rate Study.pdfGeorgetown Divide PUD_NBS Proposal for Water & Wastewater Cost of Service Analysis and Rate Study Feb 2024.pdfWRE Proposal-GDPUD Cost of Service Analysis & Rate Study.pdf

 

GDPUD Water and ALT Zone Cost-of-Service and Rate StudyFinal Report -2024

Georgetown Divide PUD Water and ALT Zone Rate Study Report Final.pdf

 The District’s existing water rate structure was developed in a 2017 study, and the existing ALT Zone rate structure was developed in a 2019 study. The District engaged Water Resources Economics, LLC (WRE) in 2024 to conduct a comprehensive Water and ALT Zone Cost-of-Service and Rate Study, which included the following objectives, available in the report above.

  • Project a five-year financial plan to meet financial performance targets for Fiscal Year (FY) 2025 through FY 2029.
  • Conduct a cost-of-service analysis based on the operating budget, capital improvement plan (CIP), and customer data to equitably allocate costs to the District’s customers.
  • Evaluate potential water and ALT Zone rate structure changes to meet the District’s policy objectives.
  • Develop a five-year water and ALT Zone rate schedule for FY 2025 through FY 2029, with implementation in January of each year.

 

Meetings and Materials 

2024_05_02 Regular Board Meeting Presentation

https://youtube.com/live/CSeT-zvleaY

2024_05_02 Water Resource Economics Presentation Water and Wastewater Rate Study

2024_07_10 Board Meeting Finacial Plan Presentation

https://youtube.com/live/4jChPonPZrs

2024_07_10 GDPUD Board Meeting Finacial Plan Presentation

2024_08_13 Special Board Meeting Water Rate Analysis Presentation

https://youtube.com/live/KluIZvjWooM

2024_08_13 GDPUD Coast Of Service Presentation, Draft Water and Wastewater Rates 

2024_08_14 Town Hall Water Rate Analysis Presentation

https://youtube.com/live/SGA36WzTvUM

2024_08_14 GDPUD Town Hall Cost of Service Presentation, Draft Water and Wastewater Rates

2024_08_15 Town Hall Water Rate Analysis Presentation

https://www.youtube.com/watch?v=5nyAHpTL7hA

2024_08_15 GDPUD Town Hall Cost of Service Presentation, Draft Water and Wastewater Rates

2024_08_22 Finance Committee Water Rate Analysis Review

https://youtube.com/live/sdkg8aj8lhk

2024_09_05 Board of Directors Analysis Review, and Community Feedback Considerations

https://youtube.com/live/1nJTRwQ0-Fg

2024_09_17 Irrigation Committee Irrigation Rate Analysis Review

https://youtube.com/live/q9e-LFZfWCU

2024_09_24 ALT Water and Wastewater Rates Town Hall    

https://youtube.com/live/-hdR5pBftRU

ALT Town Hall FLYER.pdf2024_09_24 ALT Town Hall Presentation Draft Wastewater Rates.pdf

2024_10_03 Board Meeting  Recieve Final Report 

GDPUD Water and ALT Zone Cost of Service and Rate Study Presentation Board Meeting 10-03-24 -pdf

 

 

Inputs Utilized to Develop the Cost of Service Analysis

FY24-25 Adopted Operating Budget Report.pdfFY25 CIP Budget 03.19.24.pdfKASL Water System Reliability ReportGDPUD Compensation Survey Final.pdf